BEDFORD SPORTS PAVILION 

This Greenfield site was designed and constructed for x6 natural sport pitches over 18 acres. Consisting of large cut and fill operations, top soil screening, primary land drainage and sand amelioration. A twelve week project which was sucessfully completed in nine weeks, with a twelve month establishment period before handover. 

Bulk earthworks consisted of: Top soil stripping to the whole area and laser grading sub base with Sportfields own x2 D6K LGP bulldozers. Power-screening top soil of all stones down to 20mm. Re-laying and grading top soil to meet Sport England tolerances and installing primary land drainage at 3m centres. Final grading and grass seeding. 

Contract Value: £440,000