ST MARY'S AND ST GILES PRIMARY SCHOOL, 

MILTON KEYNES

It was a pleasure to work with Jeakins Weir for the installation of a TigerTurf multi-sport system at Stony Stratford, Milton Keynes. This particular scheme posed a great challenge due to the means of access to site. Careful manoeuvring around the back of the school, due to narrow bends, was required from delivery vehicles to eliminate any risk of accident occurring. This was managed effectively by several banks men to assist both drivers and any members of the public walking nearby. An aluminium trackway was installed to keep the surrounding areas in good condition.

Total size of pitch installed;

75m x 48m plus 2x goal recesses (7m x 2m) = 3,628m2

Works undertaken;

Topsoil Strip
Cut & Fill works

Drainage system at 5m centres, including carrier drain and connections to outfall

Geotextile membrane

Type 3 Sub Base

Concrete Kerbing

40mm depth of 20mm open grade porous tarmac to ATP area

15mm Insitu rubber E-layer shockpad

Tiger Turf Evo Pro 18mm Pile Height – Sand Dressed

Multi-sport line markings for Football, Netball and Tennis

3m High Zuan Duo8 perimeter fencing with gates

Shaping of surrounding banks

Independent testing of surface

Contract Value: £280,000.00